Realizations
- Automation project of dedusting installation. Project based on Simatic S7-400, ET200 modules and Simocode proV  
equipment in distribution power supply cabinet. Company: Soda Polska CIECH SA.  
- Automation project of Building Engineering for KGHM Głogów (control system PKS Expirion, Intelligent Switching Sivacon, Siemens generator 5MW, object transducers: Siemens, Yokogawa, Endress + Hauser, water pumps 560kW). Very large project, 2011-2015. Start production in 2016/2017.  
- Project recycle process gases into the filter plant - KGHM Głogów (blower 160kW)  
- Project of the demineralized water station - KGHM Głogów (PKS Expirion Honeywell),  
- Design and start blowing fan control technology in KGHM Legnica (1,2MW Danfoss inverter, controller S7-400),  
- The design project of measurement and control dryer, control room and thickeners for ZWR Rudna (Ge-Platforms PLC RX3i, SATEL radio modems, remote PLC VersaMax, Operator QuickPanel)  
- Mud-Skid Project – installation for offshore (PLC S7-1200, Ex-Zone, HMI PC Siemens Comfort)                         - Designing the documentations (by SEE Electrical) electrical and automation parts, writing program for PLC Ge-Patforms model VersaMax, creating visualization Wonderware Archestra (InTouch), creating visualization for HMI panel Astraada. Performing P&ID diagrams (AutoCad) cooperating with principal technologist of the factory. Installation: Biogas production, Company: Alstal/Viando,                                                                              - Project (SEE Electrical), program and start production of Bio-Fuel in Poznań (PLC S7-300, Visualization Simens WinCC, HMI KTP1200 Basic), 
- Program and start production of limestone powder in Raciszyn (PLC S7-300, Danfoss inverters control Profibus, Asix operator station, measuring weight Shenck, mill 460kW, blower 160kW), 
- Project, prefabrication, program and commissioning control system of crushing line of tiles in Opoczno (PLC VersaMax), 
- Project, prefabrication, program and commissioning control system of crushing line of biomass in Power Station Ostrołęka (PLC VersaMax),                                                                                               - Project, prefabrication, program and commissioning control system of cracking and unloading frozen carbon in Power Station Osrtołęka (Control by radio, PLC VersaMax), 
- Project, prefabrication, program and commissioning control system of crushing line coal and lignite (drying, milling, transportation) – system VersaMax, Operator Panel Astraada, converters Astraada –modbus RTU, Ex Zone - Warsaw 
- Project, program and commissioning control unloading tankers and control of tank foam (polyol and TDI), reports. System based on RX3i and VersaMax controllers, data exchange via EGD files, with Foam Machinery Laaderberg via Modbus TCPIP, with Geroldinger Oszillomat via profibus DP. Two HMI QuickPanel GE. As enginer / operator station Archestra (Intouch). Company: Correct Skalmierzyce.                                                                     - Project, program and commissioning control control system Electro-Filter in Power Plant Bydgoszcz (SLC500, Operator Touch Panel Plus1000, Operator station PC – RSViewSE),                                                       - Project, program and commissioning control unloading railway wagons (chlorine), reports, RSViewSE, operator touch panel Plus 1000 Compact Logix - Zachem Bydgoszcz,